Milton-Madison Bridge to open in spring 2013 - WDRB 41 Louisville - News, Weather, Sports Community

Milton-Madison Bridge to open in spring 2013

Posted: Updated:

LOUISVILLE, Ky. (WDRB) -- The last steel beam will be lifted into place on the new Milton-Madison bridge this week.

But there are still several crucial steps that must take place before the new bridge is complete this coming spring.

Once the truss is completed this week, workers will turn their attention to building the bridge road deck by placing the formwork and 484 tons of reinforcing steel.

Preparations for the bridge deck are expected to take place over the next several months, concluding with the concrete placement in the spring.

The existing bridge remains open to traffic with a weight limit.

Copyright 2012 WDRB News.  All Rights Reserved.

  • Closed Captioning

  • Thanks to a grant from Norton Healthcare, this story and others are available in real-time closed captioning on WDRB.
    Thanks to a grant from Norton Healthcare, this story and others are available in real-time closed captioning on WDRB.