Site of former Indiana plant heated up for planned cleanup - WDRB 41 Louisville News

Site of former Indiana plant heated up for planned cleanup

Posted: Updated:

ANDERSON, Ind. (AP) - A contractor is heating up the soil at the site of a former central Indiana auto parts plant in preparation for a cleanup.

Electrodes planted in the soil at Anderson's former Delco Remy plant that was razed in 1996 have boosted the ground temperature to 70 degrees (21 Celsius). That's warm enough to begin vaporizing chemicals in the soil.

Contractor TerraTherm needs the U.S. Environmental Protection Agency's approval before it can begin assessing the site's chemical levels as part of its $4 million contract.

The site's soil and groundwater are tainted with the chemical trichloroethene, or TCE, which the EPA classifies as a carcinogen.

The Herald Bulletin reports that the site's groundwater will eventually be raised to water's boiling point so chemical-tainted steam and vapor can be trapped and removed.

Information from: The Herald Bulletin, http://www.theheraldbulletin.com

Copyright 2018 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Powered by Frankly
All content © Copyright 2000 - 2018 WDRB. All Rights Reserved. For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices.