Waterfront Wednesday setup 4-22-26.jpg

Setup underway for the first Waterfront Wednesday of the season on Wednesday, April 22, 2026. (WDRB photo)

WDRB Google Preferred Source Asset

See more WDRB reporting in Google Search

Add WDRB as a preferred source on Google to ensure that local news and weather from WDRB appears more often in Top Stories when relevant to your search.

LOUISVILLE, Ky. (WDRB) — The start of Waterfront Wednesday Aug. 26 was delayed due to police activity on the Big Four Bridge.

Officials with WFPK said at 4 p.m. the outdoor concert would start later than planned due to an "ongoing situation."

Louisville Metro Police rerouted traffic on River Road and closed the bridge as a result.

In an update at 4:30 p.m., WFPK and LMPD said the situation was resolved.

The Big Four Lawn is set to open at 6 p.m., with music starting shortly after.

Copyright 2026 WDRB Media. All Rights Reserved.