Drivers frustrated with ongoing closure of I-64 at Sherman Minton Bridge
- Updated
On Saturday, officials with the Sherman Minton Renewal Project said that lateral beams were "observed to be out of alignment" during the removal of temporary bracing added for a concrete pour.
As featured on
While construction worked continued Monday on the Sherman Minton Bridge, traffic filled the Second Street Bridge in downtown Louisville.Â
Poll
Most Popular
Articles
- Former Louisville star Teddy Bridgewater steps away from NFL, retirement likely
- Man arrested after passenger killed in southern Indiana crash
- Southern Indiana 8-year-old battling kidney disease finds donor in his uncle
- Louisville pastor charged with deed theft, homeowners urged to sign up for 'Clerk Alert'
- Louisville murder suspect faces new charges after multiple fights in jail
- CRAWFORD | Tre Richardson is finally healthy. Now Louisville gets to see how fast he can go
- DEA announces 800-pound meth seizure, largest in Indiana history
- Louisville man arrested in connection to 2 shootings and a kidnapping spits at judge during court
- Numbers drawn for Saturday's estimated $856 million Powerball jackpot
- Louisville Metro workers won't face charges in death of woman killed by garbage truck